Categories
East End Toronto Toronto Transit Uncategorized Urbanism

We can give Scarborough even more rapid transit for less money by tweaking SmartTrack

Strategically piggybacking onto Metrolinx’s upgrades will help us better nurture urbanization at Scarborough Centre while freeing up capacity on the overloaded inner-city subway system. Extending the Bloor-Danforth, no matter how many stations we include, aggravates the crowding in its best-case scenario.

Scarborough ExpressRail

By STEPHEN WICKENS, ED LEVY and STEVE FRY

—————————————————————————————————-

NOTE: Even though the SmartSpur/SER option would make Mayor Tory’s SmartTrack idea far more useful to east Toronto than in its originally conceived form, it proved to be such a threat to the one-stop Scarborough subway’s viability that all study of SmartSpur was killed on March 31, 2016, at city council after some backroom arm-twisting.

—————————————————————————————————-

One city councillor declared peace in our time and if we weren’t well into the 21st century a hat-tossing ticker-tape parade might have seemed appropriate.

Maybe a tad premature, but what a month January 2016 has been on the transit file: The mayor accepted evidence that SmartTrack’s western spur doesn’t make sense, while city planning said it will study a transitway on King Street. In Scarborough, planners and politicians claim to have found $1-billion to reinvest in Eglinton-Crosstown LRT extensions – west toward the airport and east from Kennedy to the U of T campus. (Environmental assessments are already done for those extensions, meaning plans could be shovel-ready in time to qualify for the new federal government’s promised infrastructure program.)

Can it get any better?

Excuse our sunny ways, but yes it can if John Tory is willing to re-examine how SmartTrack best piggybacks onto Metrolinx’s Regional ExpressRail in Scarborough. According to well-placed sources who’ve contributed to a new report, RER upgrades in the works will permit at the very least 14 trains an hour in each direction between Union Station and Markham. RER needs only four trains; what can we do with the other 10 or even 12?

Before SmartTrack was a gleam in the mayor’s eye, transportation researcher Karl Junkin was examining GO electrification possibilities for think tank Transport Action Ontario (the Star’s Tess Kalinowski wrote about his work in 2013). Further study now confirms one piece of TAO’s report, branching a line off Metrolinx’s tracks east to Scarborough Town Centre (almost following the current, near-defunct SRT corridor), is not just doable but can be done for $1.1-billion. That’s $1.4-billion less than the estimate for the one-stop subway idea that made news last week – $2.4-billion less than the previous three-stop plan.

Junkin’s idea, known to some as SmartSpur but now rebranded as Scarborough Express Rail (SER), can make the east part of SmartTrack smarter than the mayor ever dreamed. Aside from saving money, benefits are huge for many stakeholders if we link Kennedy to STC using GO’s corridor instead of tunnelling under Eglinton Avenue and McCowan Road.

– Scarborough residents would have a one-seat ride downtown from STC without transfers at Kennedy or Bloor-Yonge. Time savings to Union could be as much as 20 minutes. SER would include Lawrence and Ellesmere stations (and could add ones at Birchmount and Coxwell-Monarch Park).

– Residents of East York and the old city who have trouble boarding jammed Bloor-Danforth trains in the morning rush hour at stops west of Main Street would get more capacity. Thousands fewer would squeeze through overcrowed Bloor-Yonge station onto the otherwise unrelieved lower Yonge line. Compare that with making the Bloor-Danforth longer, which would only aggravate crowding for all concerned (if it doesn’t drive more people out into other modes of transportation).

– Short term, for those working to urbanize Scarborough Centre, SER’s one-seat ride to the core provides only a small advantage over a direct tunneled link via the Bloor-Danforth. But SER has much greater long-term potential as it can easily be extended north and east to Malvern on the route previously reserved for LRT ($1.4-billion can certainly get us  to Centennial College’s Progress Campus).

Toronto’s playing catch up, but urgency may finally be focusing minds in high places. We now have a mayor big enough to admit when he’s wrong, while city staff have taken over transit planning from the TTC and appear open to creativity (criticize the one-stop subway idea all your want, but if nothing else it has broken a political logjam). Maybe Metrolinx will get aboard and save us another $500-million by keeping the Crosstown LRT on the surface, rather than tunneling into and out of Kennedy station.

Yes, capacity at Union will be seriously constrained by RER and SER, further increasing the urgency of another subway through the core and up into Don Mills (the long-dreamed-of Relief Line). In the wake of the Spadina-York extension fiasco, Toronto needs a total rethink of the business and design models used for subways. We also fear the province’s RER’s operating costs will be dangerously high if we don’t soon get serious about turning suburban GO station lands into multi-use destinations, but even on that front real estate presents revenue-tool opportunities.

We have big challenges, but we’re suddenly on a bit of a roll, exhibiting flashes of creativity and civic self-confidence not seen in a half-century. Let’s keep the momentum going.

Stephen Wickens is a veteran Toronto journalist and transportation researcher. @stephenwickens1

Ed Levy PEng and transportation planner, co-founded the BA Consulting Group and is the author of Rapid Transit in Toronto, a century of plans, projects, politics and paralysis

Steve Fry is president of Pacific Links, which connects Asian, European and North American entrepreneurs and investors. His consulting work has involved infrastructure project funding in Asia. pacificlinks.ca

 

Categories
East End Toronto Toronto Transit Uncategorized Urbanism

Why Ignore Our Best Scarborough Transit Options?

It should distress everyone in Ontario that the only two official options on Toronto city council’s menu – the Eglinton-based LRT/SRT replacement and a strange, three-station preliminary subway plan – are third rate, at best

For more than three decades, the swaths of land at Kennedy station have provided little return to its owners, the public. But with the Rail + Property model, we could maximize the worth of this real estate, make transit operations more efficient and take profits to reinvest in infrastructure.

(This post was written before the Sept. 4 news that the province has another idea for building this Scarborough subway. Queen’s Park’s latest idea would be fifth best among options considered below.)

By STEPHEN WICKENS

Among the emails awaiting me after a recent offline break in the north woods were requests from some of the usual suspects for my take on the Scarborough transit saga.

For a change, I’ll admit the plan I’d favoured just weeks ago is probably now second best – a realization I hit upon while studying a report by Transport Action Ontario analyzing the GO rail system’s potential – if electrification is tackled promptly and intelligently. Released in July, it’s must reading for all who care about the GTA’s economic health and quality of life.

We’ll examine the 400-page report, titled GTHA Regional Rapid Rail: A Vision For The Future, in a separate post, but we should note here that it makes a strong case for electric-mulitple-unit technology, which among many possibilities, could quickly deliver near-subway-level service from downtown, through Kennedy station to Scarborough Town Centre, Malvern and beyond for less than Metrolinx’s allegedly funded LRT option. Too bad TAO’s report didn’t appear sooner because, as important as many of the recommendations are, they likely can’t become part of mainstream discussion in time. Through the grapevine, we hear some GTA planners and decision-makers are suddenly intrigued by this report but, so far, the Star has been the only major media outlet to clue in.

Anyway, we’re talking Scarborough transit here, and as humbling as it is that my idea – an alternate subway alignment with emphasis on the Rail + Property funding model – might now be second best, it should distress everyone that the only two official options on city council’s menu – the Eglinton-based LRT/SRT replacement and a strange, three-station preliminary subway plan – are no better than third rate.

In this part of the world, we have a history of making bad transit decisions, sometimes because we cling to any ideas that have traction, fearing that if we step back and think for a moment we mightn’t get anything done at all. But dumb decisions are among the things that have killed the public’s will to properly fund transit in recent decades. The RT may be Exhibit A. It’s bad enough that we have to junk a transit line that’s not even 30 years old. Really galling, however, is the significant likelihood we spent more on this politically driven, allegedly low-cost alternative to subway than we would have spent on an actual subway in the first place – and all the while we did not realizing the RT would be temporary.

More obvious to some of us in the early 1980s, was that any serious transit line linking STC with central Toronto via Kennedy station was a natural extension of the Bloor-Danforth and that forcing an en route transfer – especially with Kennedy station lacking any destination qualities – was foolish. In 2013, it’s still a bad idea to build in a transfer for riders going into town via Danforth and Bloor, no matter how much more convenient it may be than the current station setup and no matter how much we’re concerned that the westbound Bloor-Danforth is now at capacity in the morning rush. Encouraging more city-bound Scarborough, Durham and eastern York Region riders to use Eglinton and the already overcrowded Yonge line makes no sense at all. If you consider that an Environmental Assessement is already approved for extending the Eglinton LRT east to Kingston Road and out to Morningside Mall, it’s a bad idea to divert this line to serve northeast Scarborough. Eglinton was one part of Transit City that made sense, on nearly all counts.

As for city council’s now-favoured $2.3-billion subway option, which would provide that all-desirable one-seat service from downtown to the STC (when seats are available), the preliminary alignment, apparent funding assumptions, station spacing and the lack of regard for capitalizing on surrounding real estate are all horrible. The silos that promote or tolerate this kind of “thinking” must be smashed. The only planners who could seriously consider deep-bore tunneling east under Eglinton and north under a dead stretch of McCowan – with three more wasteful standalone stations – are yes-men or yes-women working under duress.

The only comparative benefit of the Scarborough subway plan that was before city council last month is that it would allow the SRT to continue operating while the new rapid transit is built. That’s a tiny gain for the huge amounts of waste that model would entail – at a time when transit funding is scarce. Transportation minister Glen Murray said Aug. 28 that a more firm route preference will be revealed in a few weeks. Let’s hope the powers that be come to their senses in the interim.

If we are going to build a Bloor-Danforth extension to the STC, let’s seize upon it as the long-awaited golden opportunity to demonstrate the worth of the Rail + Property (R+P) business model on this continent. It can deliver far more than big savings on a one-off transit project. R+P is the international gold standard, the model best practice for subway development that proactively links transit and land-use for economic and urban planning objectives.

For some reason, decision-makers in these parts seem hostile to R+P, which has been essential to making transit funding sustainable in Far East metropolises and has kept MTR Corp. in Hong Kong profitable for decades. Adaptation and experimentation will be required for a GTA context, but the Scarborough case presents a special opportunity because the public owns so much underutilized land in the best subway corridor.

R+P considers stations as mixed-use profit centres integrated into their surroundings, while the Toronto model treats stations as cost centres, delivering wasteful standalone buildings that repel development. Don’t confuse R+P with the Ford brothers’ dreams of free private sector subways, or with the narrow and superficial consideration of value capture contained in reports from our transit funding discussions earlier this year.

There’s no way of honestly estimating how much profit potential is available – short or long term – by employing the R+P model to real estate on this route. But then the official $2.3-billion subway extension estimate being bandied about is also vague, and necessarily so. It’s a plus-or-minus 30% number, meaning anything from $1.6-billion to $3-billion (which makes this side spat with the province over $400-million seem absurd).

If R+P is considered from the start, we’d unshackle the thought process. We consider the seemingly radical demolition of the current Kennedy station, which real estate experts agree is a major impediment to transit-oriented development in such a key, potentially urban location – where the Bloor-Danforth subway, GO rail and the Eglinton LRT will meet. The focus needs to be broadened from building a transit facility at Kennedy to fully leveraging our massive publicly owned land holdings surrounding and above the station, through Build Toronto or a new but similar entity.

R+P would require a cultural adjustment for Torontonians. Rather than decrying the unearned value granted lucky or well-connected landholders in station catchment areas, we, the people, would be in position to profit and reinvest. We own that land and should be demanding that our politicians do all they can to maximize returns from our assets and infrastructure investments. Long term, the example of efficiency would also likely nurture the political will to fund transit properly, and that’s important because R+P cannot come close to doing it alone in the North American context.

R+P for the Scarborough extension might also be a great opportunity for a provincial government trying to revive its image after the gas-plants scandal. And if the province were really smart, it would create a Build Toronto-like Crown corporation to bring in private-sector expertise for maximizing the worth of lands surrounding our GO stations. Metrolinx has quite the portfolio of underutilized land.

Making the Scarborough subway extension work economically would require adjusting the alignment through a new Kennedy station and briefly into the old SRT space before turning into the main Gatineau hydro corridor, at least to Brimley and Lawrence. That would allow us to use much-less-expensive cut-and-cover tunneling (and don’t forget that cut and cover was and is plenty good for most of the original Yonge, University and Bloor-Danforth subways). It would mean a bit more traffic disruption during construction, but if it significantly increases the chances that Scarborough residents get their subway – and get a more useful subway with more stations at a better price – it will be tolerated. Brimley is also quite dead, but it is better suited to subway than McCowan, and would allow us to reach the STC via the west side with less underground work.

Burying high-voltage wires and removing the towers while digging cut-and-cover subway tunnels can open up huge amounts of valuable real estate at station sites, such as this spot here where the Gatineau hydro corridor crosses Midland.

Better still, with hydro infrastructure buried in the Gatineau corridor during tunnel construction – a surprisingly inexpensive process – stations at Midland and at Brimley-Lawrence could be designed as the hearts transit villages on newly freed-up lands. The hydro corridor acreage is huge and we would have to get the province to transfer the lands from Hydro One to Build Toronto. But if we blend in office, residential, retail, educational and service uses, and if we focus on the pedestrian, we’d ensure subway-worthy ridership before the long-term and obviate the need for high-rises.

Even where we don’t own the land, at Scarborough Town Centre, R+P can come into play as Oxford Properties should find it worthwhile to provide a station  as part of the basement/foundation of new developments. Where R+P is used, it’s understood the marginal cost of station infrastructure tends to be much less than the upstairs premium available to the developer if the excavation, foundation and platform work is done at once.

Alas, while I love this second-best plan because it can get us past the absurd idea that Toronto cannot afford subways, it would increase Bloor-Danforth line ridership, which is a problem with all the Scarborough rapid-transit options other than the one presented in the TAO report. It’s sad, but as Toronto Transit Commission CEO Andy Byford and transit planning veteran Ed Levy point out, we’re short of good network options because the Downtown Relief Line is so overdue for the entire region.

I hold out little hope that the transit bureaucracies and politicians will wake up to the possibilities in time, and that’s a shame. This is a rare and special opportunity.